Difference between revisions of "Main Page"

From ECE Information Technology Services
Jump to navigationJump to search
(MCLD server room failure)
(ICICS X-wing power outage (Mar 1, 2025))
 
(232 intermediate revisions by 10 users not shown)
Line 15: Line 15:
 
==Announcements==
 
==Announcements==
 
<dl>
 
<dl>
<dt>[[MacLeod Server Room Failure (Aug 2012)|MacLeod Server Room Failure (Aug 7, 2012)]]
+
 
<dd>A large number of services are down due to an air conditioner failure in ECE's MacLeod server room.  We are aware of the situation; please do not file help requests.  Updates will be posted.
+
<dt>[[ICICS X-wing power outage (Mar 1, 2025)]]
<dt>[[Scheduled Power Outage (Jun 2012)|Scheduled Power Outage (Jun 9, 2012)]]
+
<dd>There is a full-building electrical shutdown scheduled for the ICICS X-wing on Saturday March 1 2025, from 06:30 am to 10:30 amThis outage also affects for Hugh Dempster Pavilion, but not the ICICS main buildingComputers should be shut down in advance of this outage to prevent damage and heat buildup.
<dd>All computing services have been restored after the scheduled power outage on Jun 9, with some exceptions.
+
 
<dt>[[Database Failure (Apr 2012)|Database Failure (Apr 10, 2012)]]
 
<dd>Several websites that rely on databases were unavailable due to a hardware failureWe have replaced that machine.
 
<dt>[[New_SSH_Servers|New SSH Servers (Jan 1, 2012)]]
 
<dd>Four new SSH servers, running 64-bit Debian 6, have been deployedThe old servers will be retired soon.
 
<dt>[[Email Infrastructure Changes|End of POP Service (Aug 26, 2011)]]
 
<dd>On Aug 26, 2011, ECE will discontinue the retrieval of email via POP and NFS.  If you are still using POP, action is needed on your part...
 
 
</dl>
 
</dl>

Latest revision as of 02:51, 28 February 2025

ECE Information Technology Services

Please select one of the HOWTO collections:

HOWTOs For Users
HOWTOs for all users of ECE computing infrastructure
HOWTOs For Researchers
HOWTOs for the ECE research community
HOWTOs For Instructors
HOWTOs for the ECE teaching community

Announcements

ICICS X-wing power outage (Mar 1, 2025)
There is a full-building electrical shutdown scheduled for the ICICS X-wing on Saturday March 1 2025, from 06:30 am to 10:30 am. This outage also affects for Hugh Dempster Pavilion, but not the ICICS main building. Computers should be shut down in advance of this outage to prevent damage and heat buildup.