Difference between revisions of "Main Page"

From ECE Information Technology Services
Jump to navigationJump to search
m (Corrected Network Failure link)
(ICICS X-wing power outage (Mar 1, 2025))
 
(224 intermediate revisions by 10 users not shown)
Line 15: Line 15:
 
==Announcements==
 
==Announcements==
 
<dl>
 
<dl>
<dt>[[Network Failure (Oct 2012)|Campus Network Failure (Oct 19, 2012)]]
+
 
<dd>ECE was affected this morning by a network failure involving multiple buildings on campus. The situation has now been resolved.
+
<dt>[[ICICS X-wing power outage (Mar 1, 2025)]]
<dt>[[Windows workstations in the UBC_ECE rejecting logons (Sep 10, 2012)]]
+
<dd>There is a full-building electrical shutdown scheduled for the ICICS X-wing on Saturday March 1 2025, from 06:30 am to 10:30 amThis outage also affects for Hugh Dempster Pavilion, but not the ICICS main building.  Computers should be shut down in advance of this outage to prevent damage and heat buildup.
<dd>A number of Windows workstations in the UBC_ECE domain (such as the workstations in undergraduate computer labs) are rejecting logons with the message, "There are currently no logon servers available to service the logon request."  '''Today only,''' you may need to reboot the workstation to clear this error.
+
 
<dt>[[Kaiser Server Room and Network Failure (Aug 2012)|Kaiser Server Room and Network Failure (Aug 28, 2012)]]
 
<dd>At 16:11, the Kaiser server room lost power due to a UPS failureThe phone and data networks for the Kaiser building, as well as some other services, were unavailable until 17:20All services should be restored by now.
 
<dt>[[Sporadic Problems With DNS and Other Services (Aug 2012)|Sporadic Problems With DNS and Other Services (Aug 23-24, 2012)]]
 
<dd>DNS lookups were failing sporadically, leading to transient failures in many other services, including:
 
authentication, e-mail, NFS, and software license servers.  That problem has now been resolved.  However, mail from the ECE mail server to Yahoo e-mail addresses will likely be blocked for the next two days.
 
<dt>[[MacLeod Server Room Failure (Aug 2012)|MacLeod Server Room Failure (Aug 7, 2012)]]
 
<dd>A large number of services were down due to an air conditioner failure in ECE's MacLeod server room.  The air conditioner has been repaired, and all services should be running again.
 
 
</dl>
 
</dl>

Latest revision as of 02:51, 28 February 2025

ECE Information Technology Services

Please select one of the HOWTO collections:

HOWTOs For Users
HOWTOs for all users of ECE computing infrastructure
HOWTOs For Researchers
HOWTOs for the ECE research community
HOWTOs For Instructors
HOWTOs for the ECE teaching community

Announcements

ICICS X-wing power outage (Mar 1, 2025)
There is a full-building electrical shutdown scheduled for the ICICS X-wing on Saturday March 1 2025, from 06:30 am to 10:30 am. This outage also affects for Hugh Dempster Pavilion, but not the ICICS main building. Computers should be shut down in advance of this outage to prevent damage and heat buildup.