Difference between revisions of "Main Page"

From ECE Information Technology Services
Jump to navigationJump to search
(ICICS X-wing power outage (Mar 1, 2025))
 
(220 intermediate revisions by 10 users not shown)
Line 15: Line 15:
 
==Announcements==
 
==Announcements==
 
<dl>
 
<dl>
<dt>[[Network Failure (Jan 2013)|Campus Network Failure (Jan 25, 2013)]]
+
 
<dd>This morning starting around 6:00am UBC IT performed a router upgrade. Due to undocumented configuration some settings were not restored. The effect was to cut off ECE from the rest of the campus and beyond. The situation was resolved at around 9:20am.
+
<dt>[[ICICS X-wing power outage (Mar 1, 2025)]]
<dt>[[End-of-Life for Matlab old license servers: fs6 and service (Jan 2013)]]
+
<dd>There is a full-building electrical shutdown scheduled for the ICICS X-wing on Saturday March 1 2025, from 06:30 am to 10:30 amThis outage also affects for Hugh Dempster Pavilion, but not the ICICS main building. Computers should be shut down in advance of this outage to prevent damage and heat buildup.
<dd>Please note that the license servers on fs6 (for research) and on service (for classroom use) are going to retire soon. Please point your software to the following aliases: matlabr-lm (for research) and matlabt-lm (for teaching).
+
 
<dt>[[Power Failure (Dec 2012)|Power Failure (Dec 18, 2012)]]
 
<dd>A BC Hydro power spike early in the morning much of the UBC Vancouver campus to lose power. Many ECE services went down around 3 am. As of 9:30 am, all services should be restored.
 
<dt>[[Network Failure (Nov 2012)|Campus Network Failure (Nov 28, 2012)]]
 
<dd>ECE was affected this morning by a network failure involving multiple buildings on campus. The situation has now been resolved.
 
<dt>[[Network Failure (Oct 2012)|Campus Network Failure (Oct 19, 2012)]]
 
<dd>ECE was affected this morning by a network failure involving multiple buildings on campus. The situation has now been resolved.
 
 
</dl>
 
</dl>

Latest revision as of 02:51, 28 February 2025

ECE Information Technology Services

Please select one of the HOWTO collections:

HOWTOs For Users
HOWTOs for all users of ECE computing infrastructure
HOWTOs For Researchers
HOWTOs for the ECE research community
HOWTOs For Instructors
HOWTOs for the ECE teaching community

Announcements

ICICS X-wing power outage (Mar 1, 2025)
There is a full-building electrical shutdown scheduled for the ICICS X-wing on Saturday March 1 2025, from 06:30 am to 10:30 am. This outage also affects for Hugh Dempster Pavilion, but not the ICICS main building. Computers should be shut down in advance of this outage to prevent damage and heat buildup.