Difference between revisions of "Main Page"

From ECE Information Technology Services
Jump to navigationJump to search
(Repeat incident 2013-03-22)
(ICICS X-wing power outage (Mar 1, 2025))
 
(215 intermediate revisions by 9 users not shown)
Line 15: Line 15:
 
==Announcements==
 
==Announcements==
 
<dl>
 
<dl>
<dt>[[Scheduled Outage in Kaiser (Mar 2013)|Scheduled Outage in Kaiser (Mar 25, 2013)]]
+
 
<dd>In order to perform an electrical upgrade, power will need to be temporarily switched off to ECE's Kaiser server room.  Network connectivity to the building and some computer services will be disrupted on Monday March 25 from 5:45 am.  Service will be restored by 8:00 am (probably much earlier, if the operation goes according to plan).
+
<dt>[[ICICS X-wing power outage (Mar 1, 2025)]]
<dt>[[Kaiser Server Room Network Failure (Mar 2013)|Kaiser Server Room Network Failure (Mar 21-22, 2013)]]
+
<dd>There is a full-building electrical shutdown scheduled for the ICICS X-wing on Saturday March 1 2025, from 06:30 am to 10:30 am. This outage also affects for Hugh Dempster Pavilion, but not the ICICS main buildingComputers should be shut down in advance of this outage to prevent damage and heat buildup.
<dd>A network switch in the Kaiser server room is repeatedly failingWe are investigating the possibility of replacing it.
+
 
<dt>[[SPAM_Phishing_emails (Feb 2013)| SPAM/Phishing emails (Feb 12, 2013)]]
 
<dd>Please note, ECE IT will never direct you to send your information via email or websites; we will never direct you to websites outside UBC. We always sign our names in our emails. Please do not respond or follow the links on "Phishing" emails.
 
<dt>[[Network Failure (Jan 2013)|Campus Network Failure (Jan 25, 2013)]]
 
<dd>This morning starting around 6:00am UBC IT performed a router upgrade. Due to some undocumented settings our service was not restored. The effect was to cut off ECE from the rest of the campus and beyond. The situation was resolved at around 9:20am.
 
<dt>[[End-of-Life for Matlab old license servers: fs6 and service (Jan 2013)]]
 
<dd>Please note that the license servers on fs6 (for research) and on service (for classroom use) are going to retire soon. Please point your software to the following aliases: matlabr-lm  (for research) and matlabt-lm (for teaching).
 
 
</dl>
 
</dl>

Latest revision as of 02:51, 28 February 2025

ECE Information Technology Services

Please select one of the HOWTO collections:

HOWTOs For Users
HOWTOs for all users of ECE computing infrastructure
HOWTOs For Researchers
HOWTOs for the ECE research community
HOWTOs For Instructors
HOWTOs for the ECE teaching community

Announcements

ICICS X-wing power outage (Mar 1, 2025)
There is a full-building electrical shutdown scheduled for the ICICS X-wing on Saturday March 1 2025, from 06:30 am to 10:30 am. This outage also affects for Hugh Dempster Pavilion, but not the ICICS main building. Computers should be shut down in advance of this outage to prevent damage and heat buildup.