Difference between revisions of "Main Page"

From ECE Information Technology Services
Jump to navigationJump to search
(ICICS X-wing power outage (Mar 1, 2025))
 
(39 intermediate revisions by 5 users not shown)
Line 1: Line 1:
 
<!--Originally written on: 2008-Jan-25-->
 
<!--Originally written on: 2008-Jan-25-->
==ECE Information Technology Services==
 
 
Please select one of the HOWTO collections:
 
 
<dl>
 
<dt>[[HOWTOs For Users]]
 
<dd>HOWTOs for all users of ECE computing infrastructure
 
<dt>[[HOWTOs For Researchers]]
 
<dd>HOWTOs for the ECE research community
 
<dt>[[HOWTOs For Instructors]]
 
<dd>HOWTOs for the ECE teaching community
 
</dl>
 
 
 
==ECE Information Technology Services==
 
==ECE Information Technology Services==
  
Line 29: Line 16:
 
<dl>
 
<dl>
  
<dt>[[Change to access to IEEExplore from off-campus]]
+
<dt>[[ICICS X-wing power outage (Mar 1, 2025)]]
<dd>Please be aware that the Library no longer provides access to IEEExplore through myVPN. Off-campus users should now use EZproxy instead:
+
<dd>There is a full-building electrical shutdown scheduled for the ICICS X-wing on Saturday March 1 2025, from 06:30 am to 10:30 am. This outage also affects for Hugh Dempster Pavilion, but not the ICICS main building. Computers should be shut down in advance of this outage to prevent damage and heat buildup.
 
 
https://login.ezproxy.library.ubc.ca/login?qurl=http%3a%2f%2fwww.library.ubc.ca
 
 
 
http://ezproxy.library.ubc.ca/login?url=http://ieeexplore.ieee.org/Xplore/DynWel.jsp
 
  
Please note that access through EZproxy is available only to current UBC students, staff, and faculty.
 
<dt>[[SSH server upgrade to Ubuntu 14.04]]
 
<dd>The ssh-linux servers are scheduled to be replaced.  Most users should not experience any disruption.  You can help test the new server and report any problems.
 
<dt>[[Network Switch Upgrades (July 2-3, 2015)]]
 
<dd>In order to upgrade two network switches, there will be a network disruption on Thursday July 2 and Friday July 3, between 5:30am and 7:30 am on each day.  Many ECE websites will be unavailable, and network connectivity in the ECE and wireless networks will likely be interrupted.
 
<dt>[[ECE Network Storage Outage- Resolved (June 1, 2015)]]
 
<dd>The ECE network storage system housing home directories and group data experienced an outage starting late last night. Network storage connectivity has been restored. End-points using NFS to mount network storage should reboot their systems to ensure stable access to storage. Please click above for more information.
 
 
</dl>
 
</dl>

Latest revision as of 02:51, 28 February 2025

ECE Information Technology Services

Please select one of the HOWTO collections:

HOWTOs For Users
HOWTOs for all users of ECE computing infrastructure
HOWTOs For Researchers
HOWTOs for the ECE research community
HOWTOs For Instructors
HOWTOs for the ECE teaching community

Announcements

ICICS X-wing power outage (Mar 1, 2025)
There is a full-building electrical shutdown scheduled for the ICICS X-wing on Saturday March 1 2025, from 06:30 am to 10:30 am. This outage also affects for Hugh Dempster Pavilion, but not the ICICS main building. Computers should be shut down in advance of this outage to prevent damage and heat buildup.