Difference between revisions of "Main Page"

From ECE Information Technology Services
Jump to navigationJump to search
Line 15: Line 15:
 
==Announcements==
 
==Announcements==
 
<dl>
 
<dl>
 +
<dt> [[SPAM_Phishing_emails (Feb 2013)| SPAM/Phishing emails (Feb 12, 2013)]]
 +
<dd> Please note, ECE IT will never direct you to send your information via email or websites; we will never direct you to websites outside UBC. We always sign our names in our emails. Please do not respond or follow the links on "Phishing" emails.
 +
 
<dt>[[Network Failure (Jan 2013)|Campus Network Failure (Jan 25, 2013)]]
 
<dt>[[Network Failure (Jan 2013)|Campus Network Failure (Jan 25, 2013)]]
 
<dd>This morning starting around 6:00am UBC IT performed a router upgrade. Due to some undocumented settings our service was not restored. The effect was to cut off ECE from the rest of the campus and beyond. The situation was resolved at around 9:20am.
 
<dd>This morning starting around 6:00am UBC IT performed a router upgrade. Due to some undocumented settings our service was not restored. The effect was to cut off ECE from the rest of the campus and beyond. The situation was resolved at around 9:20am.

Revision as of 10:14, 12 February 2013

ECE Information Technology Services

Please select one of the HOWTO collections:

HOWTOs For Users
HOWTOs for all users of ECE computing infrastructure
HOWTOs For Researchers
HOWTOs for the ECE research community
HOWTOs For Instructors
HOWTOs for the ECE teaching community

Announcements

SPAM/Phishing emails (Feb 12, 2013)
Please note, ECE IT will never direct you to send your information via email or websites; we will never direct you to websites outside UBC. We always sign our names in our emails. Please do not respond or follow the links on "Phishing" emails.
Campus Network Failure (Jan 25, 2013)
This morning starting around 6:00am UBC IT performed a router upgrade. Due to some undocumented settings our service was not restored. The effect was to cut off ECE from the rest of the campus and beyond. The situation was resolved at around 9:20am.
End-of-Life for Matlab old license servers: fs6 and service (Jan 2013)
Please note that the license servers on fs6 (for research) and on service (for classroom use) are going to retire soon. Please point your software to the following aliases: matlabr-lm (for research) and matlabt-lm (for teaching).
Power Failure (Dec 18, 2012)
A BC Hydro power spike early in the morning much of the UBC Vancouver campus to lose power. Many ECE services went down around 3 am. As of 9:30 am, all services should be restored.
Campus Network Failure (Nov 28, 2012)
ECE was affected this morning by a network failure involving multiple buildings on campus. The situation has now been resolved.
Campus Network Failure (Oct 19, 2012)
ECE was affected this morning by a network failure involving multiple buildings on campus. The situation has now been resolved.