Difference between revisions of "Main Page"

From ECE Information Technology Services
Jump to navigationJump to search
(Announced power failure; Removed old announcements)
(Kaiser power outage (February 20, 2021))
(216 intermediate revisions by 10 users not shown)
Line 15: Line 15:
 
==Announcements==
 
==Announcements==
 
<dl>
 
<dl>
<dt>[[Power Failure (Dec 2012)|Power Failure (Dec 18, 2012)]]
+
<dt>[[Kaiser power outage (February 20, 2021)]]
<dd>A BC Hydro power spike early in the morning much of the UBC Vancouver campus to lose power. Many ECE services went down around 3 am. As of 9:30 am, all services should be restored.
+
<dd>There is a power outage planned for the Kaiser building on Saturday, February 20, from 10 am to 2 pm. This outage is necessary as part of the MacLeod construction project.
<dt>[[Network Failure (Nov 2012)|Campus Network Failure (Nov 28, 2012)]]
+
 
<dd>ECE was affected this morning by a network failure involving multiple buildings on campus. The situation has now been resolved.
+
<dt>[[File and mail migration (2020)]]
<dt>[[Network Failure (Oct 2012)|Campus Network Failure (Oct 19, 2012)]]
+
<dd>In October and November 2020, ECE IT will be performing migrations of two major systems that will affect ECE users.  A file migration involves some disruption during each user's cutover period. The ECE e-mail migration will happen seamlessly and with negligible disruption for the majority of users.
<dd>ECE was affected this morning by a network failure involving multiple buildings on campus. The situation has now been resolved.
+
 
 
</dl>
 
</dl>

Revision as of 17:41, 19 February 2021

ECE Information Technology Services

Please select one of the HOWTO collections:

HOWTOs For Users
HOWTOs for all users of ECE computing infrastructure
HOWTOs For Researchers
HOWTOs for the ECE research community
HOWTOs For Instructors
HOWTOs for the ECE teaching community

Announcements

Kaiser power outage (February 20, 2021)
There is a power outage planned for the Kaiser building on Saturday, February 20, from 10 am to 2 pm. This outage is necessary as part of the MacLeod construction project.
File and mail migration (2020)
In October and November 2020, ECE IT will be performing migrations of two major systems that will affect ECE users. A file migration involves some disruption during each user's cutover period. The ECE e-mail migration will happen seamlessly and with negligible disruption for the majority of users.