Difference between revisions of "Main Page"

From ECE Information Technology Services
Jump to navigationJump to search
(Kaiser power outage (February 20, 2021))
(212 intermediate revisions by 9 users not shown)
Line 15: Line 15:
 
==Announcements==
 
==Announcements==
 
<dl>
 
<dl>
<dt> [[SPAM_Phishing_emails (Feb 2013)| SPAM/Phishing emails (Feb 12, 2013)]]
+
<dt>[[Kaiser power outage (February 20, 2021)]]
<dd> Please note, ECE IT will never direct you to send your information via email or websites; we will never direct you to websites outside UBC. We always sign our names in our emails. Please do not respond or follow the links on "Phishing" emails.
+
<dd>There is a power outage planned for the Kaiser building on Saturday, February 20, from 10 am to 2 pm. This outage is necessary as part of the MacLeod construction project.
 +
 
 +
<dt>[[File and mail migration (2020)]]
 +
<dd>In October and November 2020, ECE IT will be performing migrations of two major systems that will affect ECE users. A file migration involves some disruption during each user's cutover period. The ECE e-mail migration will happen seamlessly and with negligible disruption for the majority of users.
  
<dt>[[Network Failure (Jan 2013)|Campus Network Failure (Jan 25, 2013)]]
 
<dd>This morning starting around 6:00am UBC IT performed a router upgrade. Due to some undocumented settings our service was not restored. The effect was to cut off ECE from the rest of the campus and beyond. The situation was resolved at around 9:20am.
 
<dt>[[End-of-Life for Matlab old license servers: fs6 and service (Jan 2013)]]
 
<dd>Please note that the license servers on fs6 (for research) and on service (for classroom use) are going to retire soon. Please point your software to the following aliases: matlabr-lm  (for research) and matlabt-lm (for teaching).
 
<dt>[[Power Failure (Dec 2012)|Power Failure (Dec 18, 2012)]]
 
<dd>A BC Hydro power spike early in the morning much of the UBC Vancouver campus to lose power. Many ECE services went down around 3 am. As of 9:30 am, all services should be restored.
 
<dt>[[Network Failure (Nov 2012)|Campus Network Failure (Nov 28, 2012)]]
 
<dd>ECE was affected this morning by a network failure involving multiple buildings on campus. The situation has now been resolved.
 
<dt>[[Network Failure (Oct 2012)|Campus Network Failure (Oct 19, 2012)]]
 
<dd>ECE was affected this morning by a network failure involving multiple buildings on campus. The situation has now been resolved.
 
 
</dl>
 
</dl>

Revision as of 17:41, 19 February 2021

ECE Information Technology Services

Please select one of the HOWTO collections:

HOWTOs For Users
HOWTOs for all users of ECE computing infrastructure
HOWTOs For Researchers
HOWTOs for the ECE research community
HOWTOs For Instructors
HOWTOs for the ECE teaching community

Announcements

Kaiser power outage (February 20, 2021)
There is a power outage planned for the Kaiser building on Saturday, February 20, from 10 am to 2 pm. This outage is necessary as part of the MacLeod construction project.
File and mail migration (2020)
In October and November 2020, ECE IT will be performing migrations of two major systems that will affect ECE users. A file migration involves some disruption during each user's cutover period. The ECE e-mail migration will happen seamlessly and with negligible disruption for the majority of users.