Network disruption in Brimacombe Building (May 2014)

From ECE Information Technology Services
Revision as of 17:07, 5 May 2014 by Derekp (talk | contribs) (Created page with 'Due to a power outage in the Brimacombe Building on Saturday May 3, the network bridge to ECE stopped working. Service was restored at around 12:30 on May 5.')
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigationJump to search

Due to a power outage in the Brimacombe Building on Saturday May 3, the network bridge to ECE stopped working. Service was restored at around 12:30 on May 5.