Scheduled network outage (May 26, 2020)
From ECE Information Technology Services
Jump to navigationJump to searchIn preparation for the upcoming construction on the MacLeod building, the EECE01 network needs to be reconfigured. The UBC IT Connectivity Infrastructure team will be replacing the backbone connection and network distribution switch, currently in the MacLeod building, with links and switches in ICICS and Kaiser.
There will be up to an hour and a half outage on the EECE01 network, which spans the Kaiser, MacLeod, and ICICS buildings, to disconnect MacLeod from the EECE01 network. During this service window on Tuesday, May 26, 2020, 06:00-07:30 PDT, all wired and wireless network services in the affected buildings will be unavailable.